Loading and unloading of 5G base station vent valve and assembly of injection molding line body
OP1: Breathable membrane assembly
OP2: Valve body assembly testing
OP3: Dual station vertical injection molding machine
OP4: Robot module
Process flow: This line body is transitioned by a six axis robot. The front station peels off the breathable film and takes it out, loads it into the valve body, and then the six axis robot takes it out and puts it into the injection molding machine mold. The injection molding machine completes the molding process, and the six axis robot takes and places the formed material into the assembly equipment for leakage testing. After testing the good product, the cover assembly is completed, and the mechanism flips and positions the semi-finished product. After automatically assembling the sealing ring, the airtightness test is conducted, Test the good product and cut it off. The products are arranged in the form of one out of four, and two devices cooperate with the injection molding machine to efficiently produce at a high pace.