Automatic assembly and testing equipment for throttle valves
OP1: Valve body+O-ring assembly (oiled)+valve stem assembly+valve core assembly+adjusting wheel+tightening wheel
OP2: Valve sleeve+zinc sleeve component+button (this device can be compatible with the assembly of 4/6/8/10/12 specification intubation interfaces)
Process flow: The front section of the valve body is assembled and leak tested using a chain with a carrier cycle mode, followed by a swing disc operation
After completing the assembly and leakage testing of the valve sleeve components using the splitter disc circulation mode for the rear section of the line body, the finished product is cut off
High equipment compatibility, throttle valves 01/02/03/04 and other specifications can be customized according to requirements